Eerik Owerhall with the 4.3 tons of GEO320™ granulated asphalt bitumen™.
4,3 tons of GEO320 MRH granulated asphalt bitumen in GEO320 granulated asphalt bitumen.
Some problems with the GEO320 granule conglomeration
Box container preperation for unloading the GEO320 granules at the field trial.
GEO320™ R&D biobitumen™ reactor.
Sakary drying the GEO320 granules.
Armstrong Holland 5 tph mobile asphalt batching plant for GEO320 R&D work.
Sakary Malmberg with GEO320 Granules.
Thermoline GEO320 R&D Factory in Campbellfield 1999.
Thermoline GEO320 R&D Factory.
Manufacture of GEO320 MRH Granulated Asphalt Bitumen for the Boral Field Trial in 2000
Page 5 of 7
Inside the Thermoline R & D factory.
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
Copyright (C) 2004-2008 Ecopave Australia™, All Rights Reserved
Updated Feb 1 2008